CN COFRENTES

Located on the right bank of the Júcar River, in the province of Valencia, this facility operates with a single BWR-6 (Boiling Water Reactor) and a Mark III containment design, both supplied by General Electric.

CN ASCÓ

Located on the right bank of the Ebro River, in Tarragona, this facility operates under a two-twin-unit scheme with Pressurized Water Reactors (PWR) designed by Westinghouse. Unit I features a gross electrical output of 1,032.5 MW, while Unit II reaches 1,027.2 MW, totaling a combined...

CHILCA

From an energy infrastructure perspective, the Chilca area serves as Peru’s primary combined-cycle thermoelectric hub, concentrating an installed capacity exceeding 3,000 MW by leveraging natural gas from the Camisea pipeline transport system.

CEPSA TENERIFE

Commissioned in 1930, this complex holds the title of being the first refinery built in Spain and served as the primary energy driver for the Canary Islands for decades. Strategically located on the coast of Tenerife's capital, the facility ceased its refining operations in 2013....

CEPSA SAN ROQUE

This industrial complex spans approximately 150 hectares in the municipality of San Roque (Cádiz), forming the core of the Bay of Algeciras Chemical Hub. Its location is key due to its proximity to the Port of Algeciras, facilitating the berthing of large crude oil tankers...

CEPSA LA RÁBIDA

The La Rábida Refinery, operated by Cepsa within the Huelva Chemical Hub, is one of the most advanced and efficient energy centers in Europe. With a distillation capacity exceeding 9.5 million tonnes of crude oil per year, this facility stands out for its high technological...

CEPSA QUÍMICA

Cepsa Química consolidates its position as a global leader in the manufacturing of essential raw materials, standing out as the world’s largest producer of LAB (Linear Alkyl Benzene)—the base for biodegradable detergents—and cumene

CC VUELTA DE OBLIGADO

The Vuelta de Obligado Combined Cycle Power Plant is a strategic asset for Argentina’s National Interconnected System (SADI), located in the prominent Timbúes industrial hub. With an installed capacity reaching 800 MW, this plant stands out for its cutting-edge technology, which integrates gas and steam...

CC TERMOCENTRO

This is a strategic energy infrastructure located in the Magdalena Medio region of Colombia. With an installed capacity of approximately 300 MW, this plant stands out for its high operational efficiency, converting natural gas into electricity by leveraging the waste heat from its gas turbines...

CC TEMANE

The Temane Combined Cycle Power Plant (CTT) is positioned as Mozambique’s most ambitious power generation project, designed to transform the Southern African energy landscape. With an installed capacity of 450 MW, this plant utilizes natural gas from the local Pande and Temane gas fields to...