23Mar
23Mar
CURTIS
Developed by the Greenalia Group, this infrastructure represents one of the largest forestry biomass power generation plants in the Iberian Peninsula, with an installed capacity of 49.71 MW. The thermodynamic cycle is based on a water-cooled vibrating grate boiler, designed to process annually approximately 500,000...
23Mar
CUBILLOS
Located in the El Bayo industrial park, this distributed generation infrastructure operates under a high-efficiency combined cycle scheme, originally designed for the thermal and electrical supply of local industrial processes.
23Mar
CT FUJAIRAH
Located in Qidfa, this strategic enclave on the Gulf of Oman coast houses one of the largest concentrations of thermal power generation and desalination in the United Arab Emirates. The complex integrates three main phases: Fujairah F1 (882 MW), F2 (2,000 MW), and the recent...
23Mar
CN VANDELLOS
Located on the Tarragona coast, this facility operates with a three-loop Pressurized Water Reactor (PWR) supplied by Westinghouse, featuring a thermal power of 2,940.6 MWt and a gross electrical output of 1,087.1 MW. Unlike other assets in the Spanish nuclear fleet, its cooling system utilizes...
23Mar
CN COFRENTES
Located on the right bank of the Júcar River, in the province of Valencia, this facility operates with a single BWR-6 (Boiling Water Reactor) and a Mark III containment design, both supplied by General Electric.
23Mar
CN ASCÓ
Located on the right bank of the Ebro River, in Tarragona, this facility operates under a two-twin-unit scheme with Pressurized Water Reactors (PWR) designed by Westinghouse. Unit I features a gross electrical output of 1,032.5 MW, while Unit II reaches 1,027.2 MW, totaling a combined...
23Mar
CHILCA
From an energy infrastructure perspective, the Chilca area serves as Peru’s primary combined-cycle thermoelectric hub, concentrating an installed capacity exceeding 3,000 MW by leveraging natural gas from the Camisea pipeline transport system.
23Mar
CEPSA TENERIFE
Commissioned in 1930, this complex holds the title of being the first refinery built in Spain and served as the primary energy driver for the Canary Islands for decades. Strategically located on the coast of Tenerife's capital, the facility ceased its refining operations in 2013....
23Mar