24Mar
24Mar
OUARZAZATE
Located at the gateway to the Sahara Desert, this complex integrates four distinct plants with a total capacity of 580 MW. Noor I (160 MW) and Noor II (200 MW) utilize parabolic trough technology, featuring molten salt storage systems with 3 and 7-hour capacities, respectively.
24Mar
ORELLANA
Located in the municipality of Orellana la Vieja, this 50 MW facility utilizes parabolic trough technology for power generation through a GHESA thermodynamic steam cycle. Officially designated as Rústicas Vegas Altas (or Consol Orellana), the plant spans an area of approximately 202 hectares adjacent to...
24Mar
OLIVENZA
This thermal power plant, in operation since 2012, utilizes Parabolic Trough (PT) technology with an installed capacity of 50 MW. The solar field employs mirrors to concentrate direct radiation onto a receiver tube, where a Heat Transfer Fluid (HTF) circulates, transferring heat to a power...
23Mar
OLEFINS
This ORLEN S.A. expansion megaproject, located approximately 120 km from Warsaw, constitutes the largest petrochemical investment in Europe over the last two decades, technically centered on a new Steam Cracker.
23Mar
NOOR 3
Located within the Ouarzazate megacomplex in southern Spain, Noor 3 is one of the world's most powerful and advanced central tower plants with thermal storage. With an installed capacity of 150 MW, the plant utilizes a solar field of 7,400 large-scale heliostats (HE54 model) that...
23Mar
NESS ENERGY PROJECT
Located in the East Tullos industrial estate in Aberdeen, Scotland, this project is an Energy-from-Waste (EfW) facility that reached full commercial operation in December 2023.
23Mar
MEJILLONES
Located in Mejillones Bay, in the Antofagasta Region (Chile), this terminal serves as the primary gateway for natural gas in the country's Norte Grande region. The facility, operated by Sociedad GNL Mejillones S.A., has a nominal regasification capacity of 5.5 million m³ per day.
23Mar
LOMA LA LATA
From a technical standpoint, the complex stands out for its combined cycle configuration—the first ever built by the company. It utilizes a 3x1 configuration, comprising three 125 MW General Electric gas turbines and one 180 MW Siemens steam turbine, which was commissioned in 2011
23Mar